Commercial & industrial solar PV with a fully integrated battery energy storage system, in Sabah, Malaysia.
To be supplied: two or three sentences on the site, what it needed and what ACO ECO delivered.
To be supplied: what the site needed — e.g. high daytime energy costs, peak demand charges or backup power.
100 solar panels paired with a fully integrated battery energy storage system (BESS). [Add the system design details.]
To be supplied: results the client has approved for publication — e.g. energy generated, bill savings, CO₂ avoided.
100 panels — [module make/model], [00] kWp
BESS, fully integrated — [00] kWh
To be supplied: inverter make/model and configuration
To be supplied: grid-tied or hybrid, and the scheme used
Sandakan, Sabah, Malaysia
To be supplied: e.g. manufacturing plant, warehouse, office
To be supplied: e.g. EPCC — engineering, procurement, construction and commissioning
To be supplied: month and year
Peninsular Malaysia
Selangor, Malaysia