Sandakan Facility

Commercial & industrial solar PV with a fully integrated battery energy storage system, in Sabah, Malaysia.

100
Solar panels installed
BESS
Battery storage, fully integrated
[00] kWp
Solar capacity (to confirm)
[Year]
Commissioned (to confirm)

Project Overview

To be supplied: two or three sentences on the site, what it needed and what ACO ECO delivered.

The Challenge

To be supplied: what the site needed — e.g. high daytime energy costs, peak demand charges or backup power.

The Solution

100 solar panels paired with a fully integrated battery energy storage system (BESS). [Add the system design details.]

The Outcome

To be supplied: results the client has approved for publication — e.g. energy generated, bill savings, CO₂ avoided.

System & Delivery

System Specification

Solar PV Array

100 panels — [module make/model], [00] kWp

Battery Storage

BESS, fully integrated — [00] kWh

Inverters

To be supplied: inverter make/model and configuration

Grid Connection

To be supplied: grid-tied or hybrid, and the scheme used

Project Delivery

Location

Sandakan, Sabah, Malaysia

Facility Type

To be supplied: e.g. manufacturing plant, warehouse, office

Scope

To be supplied: e.g. EPCC — engineering, procurement, construction and commissioning

Commissioned

To be supplied: month and year

On Site

Planning a Similar Project?

Tell us about your facility and our engineering team will scope the right solution.

ACO ECO — Engineering a Greener Earth.