Enterprise Battery Energy Storage for Malaysian C&I facilities.
Powered by CLOU by Midea Energy — a global storage pioneer with over 20 years in utility-scale BESS — the Aqua-E233 is the engineering core of every ACOBank™ deployment.
Delivers rapid power during demand spikes.
Stores energy for peak periods and after-dark use.
Maintains stable operating temperatures for dependable performance.
Keeps battery temperatures tightly controlled across the system.
Provides greater usable discharge capacity.
Extends the productive operating life of the battery.
Enables precise cell-voltage monitoring.
Supports reliable operation in demanding environments.
Verified system efficiency at 0.5P.
Powered by CLOU by Midea Energy.
Automates charging, discharging and energy optimisation.
Note: Technology brands are selected for optimal engineering fit — ACO ECO deploys only bankable, Tier-1 equipment meeting strict performance, reliability, and safety standards.
Under Malaysia’s tariff structure, your peak demand charges are set by the single highest 30-minute demand spike in the billing cycle — often triggered by something as routine as heavy machinery starting up.
Automatically discharges during demand spikes.
Reduces exposure to peak demand charges.
Keeps grid demand within the engineered target.
Stores energy when tariff exposure is lower.
Deploys stored energy during higher-cost periods.
Shifts consumption towards more favourable tariff windows.
Stores excess solar generation instead of wasting available energy.
Uses stored solar when generation falls.
Increases the value of generated renewable energy.
| Outright Purchase | Zero-CAPEX ESCO Model | |
|---|---|---|
| Upfront Investment | Full capital outlay required | RM0 — funded entirely by ACO ECO |
| Ownership | Immediate, full ownership | Transfers to your business after the programme term |
| Maintenance | Managed by your team or a separate vendor | 10-Year Operation & Maintenance + performance guarantee included |
| Monthly Savings | Realised after capital is recovered | Immediate — 15–25% reduction on monthly electricity bills from day one |
| Financing Impact | May affect capital reserves | No impact on your bank credit rating |
| Pricing Certainty | Subject to maintenance cost variability | 10-year fixed-rate energy programme |
| Project Delivery | Coordinated separately | Complete EPCC (Engineering, Procurement, Construction & Commissioning) delivery |
| Government Applications | Self-managed | End-to-end application management included |
| Best Suited For | Businesses prioritising immediate asset ownership and available tax allowances | Businesses prioritising zero capital risk and immediate cash-flow savings |
Under the Zero-CAPEX model, ACO ECO designs, funds, installs, and maintains your complete ACOBank™ system — your facility enjoys the savings from day one, with full ownership transferring to you at the end of the programme term.
Regulatory Note: Qualifying Battery Energy Storage Systems installed with eligible Solar PV may be eligible for Green Investment Tax Allowance (GITA) and related government incentives. Eligibility is subject to prevailing MIDA and government policy — confirm with our engineering team during your assessment.
BESS is mandatory for new solar installations above 1MWac.
Requirement follows Suruhanjaya Tenaga’s revised SELCO guidelines.
Solar PV and BESS must be considered together for qualifying projects.
Early engineering avoids redesigning the energy architecture later.
Load profiling, Maximum Demand analysis, and BESS sizing.
Approvals, installation, testing, and commissioning under one team.
Real-time visibility of solar, battery, and grid energy flow, with predictive maintenance and remote alerts.
Continuous support that keeps performance — and savings — on track.
Reduced peak demand charges, load shifting to lower-cost tariffs, and preserved capital under Zero-CAPEX.
Higher renewable self-consumption, reduced grid reliance, and audit-ready performance data for sustainability reporting.
One accountable partner from design through decades of operation.
Fully Underwritten by Allianz | Solar & BESS Systems
Installation phase protection: Full indemnity against accidental loss or physical damage during the construction of both solar panels and battery storage (BESS) systems.
Indemnity structure: Follow project cost, or max cap at 1 mil (whichever lower) to maintain absolute financial boundaries against third-party liabilities.
One peak can inflate your bill for the entire month. Our audit finds the spikes—and engineers them out.