A rooftop-mounted, grid-tied solar PV system for a commercial & industrial facility in Peninsular Malaysia.
To be supplied: two or three sentences on the site, what it needed and what ACO ECO delivered.
To be supplied: what the site needed — e.g. high daytime energy costs, peak demand charges or backup power.
A rooftop-mounted, grid-tied solar PV array engineered around the facility’s roof. [Add the system design details.]
To be supplied: results the client has approved for publication — e.g. energy generated, bill savings, CO₂ avoided.
Rooftop-mounted — [panel count], [module make/model], [00] kWp
To be supplied: mounting system and roof type
To be supplied: inverter make/model and configuration
Grid-tied — [scheme used]
To be supplied: e.g. manufacturing plant, warehouse, office
To be supplied: e.g. EPCC — engineering, procurement, construction and commissioning
To be supplied: month and year
Sabah, Malaysia
Selangor, Malaysia